100% cotton flame retardant Hi Vis vest with reflective tape

Product TapeFR Vest Standard Shrinkage2-3% Construction100%Cotton WashingMore than 100 times ApplicationMachinery,Petroleum, Chemical, Fire, etc LogoCustomer\'s Logo welcome Weight7.5oz DescriptionLong Sleeve Working Clothes Q:Do you provide sample? How long&n

Featured Products

100%Cotton Flame Resistant Hi Vis Vest with Reflective Tape
Product TapeFR Vest
 
Standard100%Cotton Flame Resistant Hi Vis Vest with Reflective Tape
 
Shrinkage2-3%
 
Construction100%Cotton
 
WashingMore than 100 times
 
ApplicationMachinery,Petroleum, Chemical, Fire, etc
 
LogoCustomer's Logo welcome
 
Weight7.5oz
 
DescriptionLong Sleeve Working Clothes
 
100%Cotton Flame Resistant Hi Vis Vest with Reflective Tape


100%Cotton Flame Resistant Hi Vis Vest with Reflective Tape

100%Cotton Flame Resistant Hi Vis Vest with Reflective Tape

100%Cotton Flame Resistant Hi Vis Vest with Reflective Tape

100%Cotton Flame Resistant Hi Vis Vest with Reflective Tape

Q:Do you provide sample? How long it takes?
A: Sample can be provided. Regular item in stock can be sent within 1-2 days.Customized Resistant Clothing will take 7-10 days.
 
Q:Customized clothes, can you provide 2112 certification?
A:Yes, If you need, we can provide it.
  
Q: Do you supply OEM service? Can you make as our design? Can I put our LOGO on protective clothing?
A: Yes, we can customize the design for you, which exactly as your demand.Your LOGO can be put on clothing as requested.
 
Q: What are your advantages over other suppliers?
A: We can provide purchasing information for fabric and fabric accessories, and we have inspection for them before manufacturing.
 
Q:How about the shipment and package?
A:Packaging Details:
one plastic bag for each piece, 20 pieces in one carton, 15 pieces (coverall) in one carton.
We have FCL and LCL transport.
B:Shipment: By sea & By air
Port: Shanghai/Qingdao
 
Q: How's the lead times?
A1: Basic Products - Sample: 7-10 days;
Production Time: 30-60 days after PP sample approved
A2: Custom Products - Sample: 10-15 days for busy season;
7-10 days for slack season;
Production Time: 85-100 days after PP sample approved.

 

Contact us

Please feel free to give your inquiry in the form below We will reply you in 24 hours